 Oil Depot

Project: Oil depot
Objectives: Oil depot installation as an EPC contract
Location: Chabahar
Implemented by: Engineering & project Dept.
Contract date: Feb 4th 2006
Capacity: 9 tanks with the total capacity of 71 million liter
Contractors:(Tank installation) Azarab Co. Storage facilities installation: Setiran Co.  
Project status: The tanks has been delivered &  the facilities operation  are  in the  progress of 92%
Optimization & Revamping Of The Rey Oil Depot
Project: Optimization & revamping of the Rey Oil Depot
Objectives: Optimization & revamping
Location: Rey
Implemented by: Engineering & Project Dept.
Contract date: March 8th 2006
Contractors: Paydar Poulad Pishro Co.
Project status: Overall progress 69%
Oil Depot Project
Project: Oil depot
Objectives: Oil depot installation as an EPC contract
Location: Shiraz
Implemented by: Engineering & Project Dept.
Contract date: June 21th 2007
Capacity: 10 tanks with the total capacity of 165 million liter
Contractors: Roshd Sanat & Sitran consulting Engineers consortium
Project status: Overall Progress: 37%
Oil Depot Facilities
Project: Oil depot facilities
Objectives: Oil depot installation Supporting product export
Location: Dareshahr
Implemented by: Engineering & Project Dept.
Contract date: Oct 2th 2005
Capacity: 9 tanks with the total capacity of 101 million liter
Contractors(Tanks): Machine Sazi Arak Co. / (Storage facilities) Zhalke Co.
Project status: Overall progress 100%
Fuelling Facilities
Project: Fuelling facilities
Location: Zanjan
Implemented by: Engineering &  Project Dept.
Contract date: Dec 26th 2007
Contractors: Rah Kavir Co.
License: Accessory equipment
Project status: Overall progress 85%  
The Strategic Storage Tanks
Project: Installation of the strategic storage tanks in Tehran 
Objectives: Supporting the Northern provinces of Tehran, Ghazvin & Zanjan in the peak consumption
Location: Tehran
Implemented by: Engineering &  Project Dept.
Capacity: 1.66 million liter
Project status: Under implementation
 
 Oil Depot No-2 Expansion
Project: Oil Depot No.2 Expansion
Objectives: Supporting the distribution operation in the Khorasan Province & neighboring Provinces
Location: Mashhad
Implemented by: Engineering & Project Dept.
Capacity: 100 million liter
License: Accessory equipment
Project status:  Engineering phase
Fuel Oil Storage Tanks Facilities
Project: Fuel oil storage in Sang Bast
Location: Mashhad
Implemented by: Engineering & Project Dept.
Capacity: 140 million liter
Project status:Under study
Oil Depot
Project: Oil depot
Objectives: Oil depot installation
Location: Birjand
Implemented by: Engineering & Project Dept.
Contract date: Jan 14 th 2006
Capacity: 11 tanks with the total capacity of 100 million liter
Contractors: Arya Petrogas Co.
Construction: Physical progress: 48%
 